CO129-124 - Sir MacDonnell - 1867 [8-9] — Page 353

CO129 Colonial Office Hong Kong Records 理藩院香港檔案 All AI Reviewed

Proceeding with the filling

is completed to Low water

Mark, the wall would

then be backed up. Course

b

Coc no e

03

finished

Buildings, Trees & A great number of trees

have been blown down

and injured. The repairs

to Roads

are

being executed

by the Chain

Gang.

With regard to Buildings

considerable repairs to Roofs, Doors, Windows &c

are required. I should

roughly estimate the Cost

at £2000 and as

these repairs cannot be delayed

345

I beg to be authorized to incur the necessary expenses.

I have the honor to be

Sir,

Your most obedient servant.

Muirson, Surveyor General.

Edit History

2026-05-19 21:37:26 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
Proceeding with the filling is completed to Low water Mark, the wall would then be backed up. Course b Coc no e 03 finished Buildings, Trees & A great number of trees have been blown down and injured. The repairs to Roads are being executed by the Chain Gang. With regard to Buildings considerable repairs to Roofs, Doors, Windows &c are required. I should roughly estimate the Cost at £2000 and as these repairs cannot be delayed 345 I beg to be authorized to incur the necessary expenses. I have the honor to be Sir, Your most obedient servant. Muirson, Surveyor General.
Baseline (Original)
proceed litt the filling is completed to Low water Mark, the wall would then be backed up Course b Coc no e 03 finished Buildings, Trees & A great number of êtrees have been blown down and injured. The repairs to Roads are by the Chain being executed Gang. regard to Buildings With considerable repairs to Roofs, Doors, Windows &c AN required _ I should roughly estimate the Cost at f 2000 and as these repairs cannot be delayed 345 I beg to be authorized to incur the necessary expenses. I have the honor to be Siz Your most obedient servant. Muison Surveyor General .
2026-05-19 21:37:26 · Baseline
View content

proceed litt the filling

is completed to Low water

Mark, the wall would

then be backed up Course

b

Coc no e

03

finished

Buildings, Trees & A great number of êtrees

have been blown down

and injured. The repairs

to Roads

are

by the Chain

being executed

Gang.

regard to Buildings

With

considerable repairs to Roofs, Doors, Windows &c

AN

required _ I should

roughly estimate the Cost

at f 2000 and as

these

repairs cannot be delayed

345

I beg to be authorized to incur the necessary expenses.

I have the honor to be

Siz

Your most obedient servant.

Muison Surveyor General .